
MachiningMore>
The production floor covers an area of 8,000 square meters and is equipped with 140 processing machines.
The company has introduced over 140 high-precision processing machines in phases, aiming to establish an efficient and precise production system for Showerheads. These top-notch equipment deliver outstanding processing performance, capable of achieving high precision and fine hole machining, meeting the mass production requirements for a wide range of Showerhead types and specifications.